Start with a dimensioned plan
Provide an overhead layout showing room boundaries, entrances, columns, service zones and each cubicle position. Record overall wall-to-wall dimensions and relevant depths. Show which dimensions are confirmed on site and which are preliminary.
Drawings do not need to be elaborate at the inquiry stage, but they must be readable. A marked PDF, CAD file or clear sketch can establish the initial scope when dimensions and notes are unambiguous.
- Overall room width and depth
- Cubicle openings and divider depths
- Door handing or preferred swing direction
- Wall, floor and ceiling interfaces
- Urinal screen or special-access cubicle locations
List quantities and component scope
State the number of cubicles, doors, dividers, pilasters and urinal partitions if known. If the factory is expected to calculate the component schedule from a plan, say so explicitly. Confirm whether hardware, brackets, supports, headrails, fasteners or spare items belong in the requested scope.
A quantity such as ten cubicles is not enough to establish an accurate component list when layouts differ. Corner, wall-to-wall and freestanding arrangements can require different combinations.
Define material, finish and mounting direction
Name the preferred material and identify whether an alternative should be quoted. Provide finish references or request physical samples before final approval. Specify floor-mounted, headrail-braced, floor-to-ceiling or another project-defined arrangement only after checking site conditions.
Do not rely on color appearance from an uncalibrated screen for final acceptance. Sample availability and batch coordination should be confirmed for the order.
Record site and compliance constraints
Include relevant local accessibility clearances, privacy expectations, wet-area conditions and substrate information supplied by the project team. Identify conflicts such as skirting, pipes, tile transitions or suspended ceilings that could affect mounting.
The buyer, designer and local professionals should verify code compliance and field dimensions. The factory drawing review supports coordination but does not replace site responsibility.
Add commercial and delivery information
Provide the destination city and country, requested delivery period, trade term if already decided, and any packaging or labeling requirements. Ask the quotation to separate included and excluded items so freight, installation and taxes are not inferred.
Before order release, reconcile the quotation, approved drawing, finish selection, packing requirements and delivery terms as one controlled document set.
Frequently asked questions
Which dimensions are essential for a toilet partition quote?
Overall room dimensions, cubicle widths and depths, opening positions, door directions and relevant floor, wall or ceiling interfaces are the usual starting point.
Can I upload a DWG or PDF drawing?
Yes. This website accepts PDF, DWG, DXF, JPG, PNG and ZIP project files within the stated upload limits.
Should freight and installation be included automatically?
No. Request each item explicitly and confirm the trade term, destination and installation responsibility in writing because these vary by project.